1129 WALTON LN, AUSTIN, TX, 78721
0 open permits
9 permits have been filed at 1129 WALTON LN since 2023, involving 4 applicants. All 9 permits have been closed.
9
Total Permits
0
Open
9
Closed
4
Applicants
Permit Type Breakdown
Building2 rated
100.0% closed vs 93% median, 7.1 points higher
Electrical2 rated
100.0% closed vs 95% median, 5.0 points higher
Mechanical2 rated
100.0% closed vs 95% median, 4.8 points higher
Plumbing2 rated
100.0% closed vs 94% median, 5.9 points higher
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| VZ Construction **MAIN** | 3 | 0 |
| Elite Heating and Air Conditioning LLC | 2 | 0 |
| AEI Electric LLC | 2 | 0 |
| A Plus PCS Plumbing Co | 2 | 0 |
All Permits
9 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Closed | 2023-011626 DS | Driveway / Sidewalks | 1129 WALTON LN, AUSTIN | VZ Construction **MAIN** | Jan 5, 2024 | Feb 20, 2024 | — |
| Closed | 2023-011626 MP | Mechanical Permit | 1129 WALTON LN, AUSTIN | Elite Heating and Air Conditioning LLC | Aug 29, 2023 | Apr 2, 2024 | — |
| Closed | 2023-011627 MP | Mechanical Permit | 1129 WALTON LN, AUSTIN | Elite Heating and Air Conditioning LLC | Aug 29, 2023 | Mar 19, 2024 | — |
| Closed | 2023-011626 EP | Electrical Permit | 1129 WALTON LN, AUSTIN | AEI Electric LLC | Jun 20, 2023 | Feb 27, 2024 | — |
| Closed | 2023-011627 EP | Electrical Permit | 1129 WALTON LN, AUSTIN | AEI Electric LLC | Jun 20, 2023 | Feb 27, 2024 | — |
| Closed | 2023-011626 PP | Plumbing Permit | 1129 WALTON LN, AUSTIN | A Plus PCS Plumbing Co | May 17, 2023 | Apr 2, 2024 | — |
| Closed | 2023-011627 PP | Plumbing Permit | 1129 WALTON LN, AUSTIN | A Plus PCS Plumbing Co | May 17, 2023 | Jul 3, 2024 | — |
| Closed | 2023-011626 BP | Building Permit | 1129 WALTON LN, AUSTIN | VZ Construction **MAIN** | Apr 13, 2023 | Jul 18, 2024 | $0 |
| Closed | 2023-011627 BP | Building Permit | 1129 WALTON LN, AUSTIN | VZ Construction **MAIN** | Apr 13, 2023 | Jul 18, 2024 | $0 |