11821 ARRAN ST, AUSTIN, TX, 78754
1 open permit
7 permits have been filed at 11821 ARRAN ST since 2016, involving 5 applicants. 1 remains open and 6 have been closed.
7
Total Permits
1
Open
6
Closed
5
Applicants
Permit Type Breakdown
Electrical2 rated
100.0% closed vs 95% median, 5.0 points higher
Plumbing2 rated
50.0% closed vs 94% median, 44.1 points lower
Building1 rated
100.0% closed vs 93% median, 7.1 points higher
Mechanical1 rated
100.0% closed vs 95% median, 4.8 points higher
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| In Charge Electrical Services | 2 | 0 |
| ASHTON AUSTIN RESIDENTIAL, L.L.C.****MAIN*** | 2 | 0 |
| Excalibur Plumbing | 1 | 0 |
| Erik Wallace | 1 | 0 |
All Permits
7 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Open | 2017-037135 PP | Plumbing Permit | 11821 ARRAN ST, AUSTIN | Apr 5, 2017 | Oct 2, 2017 | — | |
| Closed | 2016-092233 MP | Mechanical Permit | 11821 ARRAN ST, AUSTIN | Erik Wallace | Oct 18, 2016 | Apr 6, 2017 | — |
| Closed | 2016-092233 PP | Plumbing Permit | 11821 ARRAN ST, AUSTIN | Excalibur Plumbing | Aug 27, 2016 | Apr 6, 2017 | — |
| Closed | 2016-092233 DS | Driveway / Sidewalks | 11821 ARRAN ST, AUSTIN | ASHTON AUSTIN RESIDENTIAL, L.L.C.****MAIN*** | Aug 18, 2016 | Apr 3, 2017 | — |
| Closed | 2016-092233 EP | Electrical Permit | 11821 ARRAN ST, AUSTIN | In Charge Electrical Services | Aug 15, 2016 | Apr 5, 2017 | — |
| Closed | 2016-092233 BP | Building Permit | 11821 ARRAN ST, AUSTIN | ASHTON AUSTIN RESIDENTIAL, L.L.C.****MAIN*** | Aug 9, 2016 | Apr 6, 2017 | $144,760 |
| Closed | 2016-095829 EP | Electrical Permit | 11821 ARRAN ST, AUSTIN | In Charge Electrical Services | Aug 9, 2016 | Aug 29, 2016 | — |