2102 HOLLY ST, AUSTIN, TX, 78702
4 open permits
5 permits have been filed at 2102 HOLLY ST since 2010, involving 5 applicants. 4 remain open and 1 has been closed.
5
Total Permits
4
Open
1
Closed
5
Applicants
Permit Type Breakdown
Building2 rated
50.0% closed vs 93% median, 42.9 points lower
Electrical1 rated
0.0% closed vs 95% median, 95.0 points lower
Mechanical1 rated
0.0% closed vs 95% median, 95.2 points lower
Plumbing1 rated
0.0% closed vs 94% median, 94.1 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| Suttin Construction | 1 | 1 |
| Saucedo Electric | 1 | 1 |
| Level Best Foundation Repair Inc | 1 | 0 |
| Lakeway Plumbing Co. | 1 | 1 |
| Blue Sky Heating and Air | 1 | 1 |
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Open | 2019-171869 PP | Plumbing Permit | 2102 HOLLY ST, AUSTIN | Lakeway Plumbing Co. | Aug 21, 2019 | Feb 26, 2020 | — |
| Open | 2019-040211 BP | Building Permit | 2102 HOLLY ST, AUSTIN | Suttin Construction | Mar 15, 2019 | Sep 11, 2019 | $800 |
| Open | 2018-113260 MP | Mechanical Permit | 2102 HOLLY ST, AUSTIN | Blue Sky Heating and Air | Jul 6, 2018 | Jan 9, 2019 | — |
| Open | 2016-032165 EP | Electrical Permit | 2102 HOLLY ST, AUSTIN | Saucedo Electric | Apr 1, 2016 | Oct 8, 2016 | — |
| Closed | 2010-056139 BP | Building Permit | 2102 HOLLY ST, AUSTIN | Level Best Foundation Repair Inc | Jun 29, 2010 | Apr 8, 2016 | $13,240 |