2300 1/2 S LAMAR BLVD, AUSTIN, TX, 78704
1 open permit
8 permits have been filed at 2300 1/2 S LAMAR BLVD since 2012, involving 8 applicants. 1 remains open and 7 have been closed.
8
Total Permits
1
Open
7
Closed
8
Applicants
Permit Type Breakdown
Building6 rated
83.3% closed vs 93% median, 9.6 points lower
Electrical2 rated
100.0% closed vs 95% median, 5.0 points higher
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| Waukesha Pearce Industries | 1 | 0 |
| T-MOBILE USA, INC. | 1 | 0 |
| Robert Schmidt | 1 | 0 |
| Phillip Aaron | 1 | 0 |
| Gotel | 1 | 0 |
| Glotel Inc | 1 | 1 |
| ESA Engineering | 1 | 0 |
| CROWN CASTLE USA | 1 | 0 |
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Open | 2020-146270 BP | Building Permit | 2300 1/2 S LAMAR BLVD, AUSTIN | Glotel Inc | Sep 25, 2020 | Mar 1, 2022 | — |
| Closed | 2019-013701 EP | Electrical Permit | 2300 1/2 S LAMAR BLVD, AUSTIN | Phillip Aaron | Jun 28, 2019 | Jul 26, 2019 | — |
| Closed | 2019-130895 BP | Building Permit | 2300 1/2 S LAMAR BLVD, AUSTIN | Gotel | Jun 18, 2019 | May 28, 2020 | — |
| Closed | 2019-013701 BP | Building Permit | 2300 1/2 S LAMAR BLVD, AUSTIN | Waukesha Pearce Industries | Jan 30, 2019 | Oct 1, 2019 | — |
| Closed | 2017-065912 BP | Building Permit | 2300 1/2 S LAMAR BLVD, AUSTIN | ESA Engineering | Jun 5, 2017 | Aug 9, 2017 | — |
| Closed | 2014-104627 BP | Building Permit | 2300 1/2 S LAMAR BLVD, AUSTIN | CROWN CASTLE USA | Sep 30, 2014 | Mar 10, 2015 | — |
| Closed | 2012-065204 EP | Electrical Permit | 2300 1/2 S LAMAR BLVD, AUSTIN | Robert Schmidt | Dec 18, 2012 | Dec 21, 2012 | — |
| Closed | 2012-065204 BP | Building Permit | 2300 1/2 S LAMAR BLVD, AUSTIN | T-MOBILE USA, INC. | Jun 29, 2012 | Jan 3, 2013 | — |