2901 S 1ST ST UNIT 102, AUSTIN, TX, 78704
0 open permits
5 permits have been filed at 2901 S 1ST ST UNIT 102 since 2015, involving 5 applicants. All 5 permits have been closed.
5
Total Permits
0
Open
5
Closed
5
Applicants
Permit Type Breakdown
Building2 rated
100.0% closed vs 93% median, 7.1 points higher
Electrical1 rated
100.0% closed vs 95% median, 5.0 points higher
Mechanical1 rated
100.0% closed vs 95% median, 4.8 points higher
Plumbing1 rated
100.0% closed vs 94% median, 5.8 points higher
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| Urban Air | 1 | 0 |
| South First Pizzeria Group | 1 | 0 |
| IE2 CONSTRUCTION, INC | 1 | 0 |
| Austin Electrical Contractors | 1 | 0 |
| Alta Vista Plumbing | 1 | 0 |
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Closed | 2015-137824 EP | Electrical Permit | 2901 S 1ST ST UNIT 102, AUSTIN | Austin Electrical Contractors | Jan 25, 2016 | May 20, 2016 | — |
| Closed | 2015-137824 MP | Mechanical Permit | 2901 S 1ST ST UNIT 102, AUSTIN | Urban Air | Dec 15, 2015 | Jun 9, 2016 | — |
| Closed | 2015-137824 PP | Plumbing Permit | 2901 S 1ST ST UNIT 102, AUSTIN | Alta Vista Plumbing | Nov 23, 2015 | Jun 6, 2016 | — |
| Closed | 2015-137824 BP | Building Permit | 2901 S 1ST ST UNIT 102, AUSTIN | South First Pizzeria Group | Nov 17, 2015 | Jun 27, 2016 | — |
| Closed | 2015-065134 BP | Building Permit | 2901 S 1ST ST UNIT 102, AUSTIN | IE2 CONSTRUCTION, INC | Jun 2, 2015 | Jul 15, 2015 | — |
See Other Addresses
2901 S 1ST ST UNIT 2002901 S 4TH ST2901 S 5TH ST2901 S CAPITAL OF TEXAS HWY NB2901 S CAPITAL OF TEXAS HWY NB BLDG 1 UNIT R01A2901 S CAPITAL OF TEXAS HWY NB BLDG 72901 S CAPITAL OF TEXAS HWY NB BLDG A2901 S CAPITAL OF TEXAS HWY NB BLDG A UNIT 10A2901 S CAPITAL OF TEXAS HWY NB BLDG B UNIT C122901 S CAPITAL OF TEXAS HWY NB BLDG B UNIT H18