719 W WILLIAM CANNON DR UNIT 109, AUSTIN, TX, 78745
0 open permits
4 permits have been filed at 719 W WILLIAM CANNON DR UNIT 109 since 2011, involving 4 applicants. All 4 permits have been closed.
4
Total Permits
0
Open
4
Closed
4
Applicants
Permit Type Breakdown
Building2 rated
100.0% closed vs 93% median, 6.9 points higher
Electrical1 rated
100.0% closed vs 95% median, 5.0 points higher
Mechanical1 rated
100.0% closed vs 95% median, 4.8 points higher
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| The Turnkey Construction | 1 | 0 |
| Pruneda Construction***MAIN** | 1 | 0 |
| Longhorn Electric LLC | 1 | 0 |
| Air Kool Mechanical | 1 | 0 |
All Permits
4 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Closed | 2019-242257 MP | Mechanical Permit | 719 W WILLIAM CANNON DR UNIT 109, AUSTIN | Air Kool Mechanical | Mar 17, 2020 | Apr 8, 2020 | — |
| Closed | 2020-009431 EP | Electrical Permit | 719 W WILLIAM CANNON DR UNIT 109, AUSTIN | Longhorn Electric LLC | Jan 30, 2020 | Apr 8, 2020 | — |
| Closed | 2020-009428 BP | Building Permit | 719 W WILLIAM CANNON DR UNIT 109, AUSTIN | Pruneda Construction***MAIN** | Jan 22, 2020 | Apr 20, 2020 | — |
| Closed | 2011-015983 BP | Building Permit | 719 W WILLIAM CANNON DR UNIT 109, AUSTIN | The Turnkey Construction | Mar 1, 2011 | Mar 16, 2011 | — |