8300 MILLWAY DR, AUSTIN, TX, 78757
0 open permits
6 permits have been filed at 8300 MILLWAY DR since 2010, involving 6 applicants. All 6 permits have been closed.
6
Total Permits
0
Open
6
Closed
6
Applicants
Permit Type Breakdown
Electrical2 rated
100.0% closed vs 95% median, 5.0 points higher
Mechanical2 rated
100.0% closed vs 95% median, 4.8 points higher
Building1 rated
100.0% closed vs 93% median, 7.1 points higher
Plumbing1 rated
100.0% closed vs 94% median, 5.9 points higher
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| Sunvison Electric | 1 | 0 |
| Randall Baker | 1 | 0 |
| Murray Construction | 1 | 0 |
| Mr. Rol-Air LLC | 1 | 0 |
| HC Plumbing | 1 | 0 |
| Eskew Electric | 1 | 0 |
All Permits
6 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Closed | 2017-024047 BP | Building Permit | 8300 MILLWAY DR, AUSTIN | Murray Construction | Mar 1, 2017 | Apr 4, 2017 | $2,200 |
| Closed | 2016-111084 MP | Mechanical Permit | 8300 MILLWAY DR, AUSTIN | Randall Baker | Sep 15, 2016 | Dec 7, 2016 | — |
| Closed | 2016-079671 EP | Electrical Permit | 8300 MILLWAY DR, AUSTIN | Sunvison Electric | Jul 12, 2016 | Jul 13, 2016 | — |
| Closed | 2016-078802 PP | Plumbing Permit | 8300 MILLWAY DR, AUSTIN | HC Plumbing | Jul 5, 2016 | Jul 15, 2016 | — |
| Closed | 2013-084499 EP | Electrical Permit | 8300 MILLWAY DR, AUSTIN | Eskew Electric | Aug 13, 2013 | Aug 20, 2013 | — |
| Closed | 2010-074820 MP | Mechanical Permit | 8300 MILLWAY DR, AUSTIN | Mr. Rol-Air LLC | Aug 27, 2010 | Sep 14, 2010 | — |