Monument Solar LLC
Monument Solar LLC has filed 5 building permits in Austin since 2024, closing 100% of 1 rated permits. 2 permits remain open. Primarily files electrical permits. 5.9 points above the city median of 94.1%. Busiest year: 2026 with 3 permits.
100%
5
Construction Permits
2
Currently Open
1
Rate-Eligible
permits > 1yr old
2024–2026
Years Active
Closure rate based on permits older than 1 year. "Issued" and "Stop Work" statuses are excluded.
Performance by Permit Type
Electrical1 rated
100.0% closed vs 95% median, 5.0 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2026(YTD)
—
Open2
Closed1
Too early to rate — permits need 1 year to mature
2025
—
Open0
Closed1
Too early to rate — permits need 1 year to mature
2024
100.0%
Open0
Closed1
1 closed / 1 rated
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | 2026-023209 EP | Electrical Permit | 9600 ANGELWYLDE DR, AUSTIN | Mar 3, 2026<1yr | Aug 30, 2026 | — |
| Closed | 2026-023248 EP | Electrical Permit | 9600 ANGELWYLDE DR, AUSTIN | Feb 27, 2026<1yr | May 12, 2026 | — |
| Open | 2025-156909 EP | Electrical Permit | 9604 ANGELWYLDE DR, AUSTIN | Feb 26, 2026<1yr | Aug 25, 2026 | — |
| Closed | 2025-157469 EP | Electrical Permit | 9604 ANGELWYLDE DR, AUSTIN | Dec 15, 2025<1yr | May 12, 2026 | — |
| Closed | 2024-043773 EP | Electrical Permit | 8018 CORRIGAN PASS, AUSTIN | Apr 11, 2024 | Jun 3, 2024 | — |