Solarcity (DBA Tesla Energy)

Solarcity (DBA Tesla Energy) has filed 5 building permits in Austin since 2017, closing 20% of 5 rated permits. 4 permits remain open. Primarily files building permits. 74.1 points below the city median of 94.1%. Busiest year: 2018 with 4 permits.

20%
-74.1 vs 94% median
5
Construction Permits
4
Currently Open
5
Rate-Eligible
permits > 1yr old
2017–2018
Years Active

Closure rate based on permits older than 1 year. "Issued" and "Stop Work" statuses are excluded.

Performance by Permit Type

Building3 rated

33.3% closed vs 93% median, 59.6 points lower

Electrical2 rated

0.0% closed vs 95% median, 95.0 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2018

0.0%
Open4
Closed0

0 closed / 4 rated

2017

100.0%
Open0
Closed1

1 closed / 1 rated

All Permits

5 permits
StatusPermit #AddressIssued
Open2018-091335 EP5307 INDIO DR, AUSTINJun 6, 2018
Open2018-091334 EP5307 INDIO DR, AUSTINJun 6, 2018
Open2018-091334 BP5307 INDIO DR, AUSTINJun 6, 2018
Open2018-078929 BP6005 COUGAR DR, AUSTINMay 9, 2018
Closed2017-095996 BP2301 SCARBROUGH DR UNIT 340, AUSTINAug 7, 2017

See Other Applicants