99-101A Franklin ST, Allston, MA, 02134
5 open permits
7 permits have been filed at 99-101A Franklin ST since 2022, involving 6 applicants. 5 remain open and 2 have been closed.
7
Total Permits
5
Open
2
Closed
6
Applicants
Permit Type Breakdown
Electrical2 rated
100.0% closed vs 60% median, 39.7 points higher
Building2 rated
0.0% closed vs 31% median, 31.0 points lower
Gas1 rated
0.0% closed vs 59% median, 58.8 points lower
Plumbing1 rated
0.0% closed vs 63% median, 63.0 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| DAVID PATENAUDE | 2 | 2 |
| ken holman | 1 | 0 |
| Tiago Uzai | 1 | 1 |
| Owen Mack | 1 | 1 |
| Moacir Filho | 1 | 1 |
| Ecoloop Construction | 1 | 0 |
All Permits
7 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Open | SF1709554 | Short Form Bldg Permit | 99-101A Franklin ST, Allston | Tiago Uzai | May 27, 2025 | Nov 27, 2025 | $30,186 |
| Closed | E1709235 | Electrical Permit | 99-101A Franklin ST, Allston | Ecoloop Construction | May 23, 2025 | Nov 23, 2025 | $11,700 |
| Closed | E1693076 | Electrical Permit | 99-101A Franklin ST, Allston | ken holman | Feb 20, 2025 | Aug 20, 2025 | $15,000 |
| Open | SF1573735 | Short Form Bldg Permit | 99-101A Franklin ST, Allston | Moacir Filho | Feb 27, 2024 | Aug 27, 2024 | $9,450 |
| Open | PL1549288 | Plumbing Permit | 99-101A Franklin ST, Allston | DAVID PATENAUDE | Dec 1, 2023 | Jun 1, 2024 | $2,000 |
| Open | G1549284 | Gas Permit | 99-101A Franklin ST, Allston | DAVID PATENAUDE | Dec 1, 2023 | Jun 1, 2024 | $1,500 |
| Open | ALT1214107 | Long Form/Alteration Permit | 99-101A Franklin ST, Allston | Owen Mack | Aug 16, 2022 | Feb 16, 2023 | $0 |