ANTONIO PIRES

ANTONIO PIRES has filed 5 building permits in Boston since 2023, closing 33% of 3 rated permits. 3 permits remain open. Primarily files building permits. 16.7 points below the city median of 50.0%.

33%
-16.7 vs 50% median
4
Construction Permits
5 total
3
Currently Open
3
Rate-Eligible
permits > 1yr old
2023–2026
Years Active

Closure rate based on permits older than 1 year. "Issued" and "Stop Work" statuses are excluded.

Performance by Permit Type

Building3 rated

33.3% closed vs 31% median, 2.3 points higher

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2026(YTD)

Open1
Closed0

Too early to rate — permits need 1 year to mature

2025

0.0%
Open1
Closed0

0 closed / 1 rated

2024

0.0%
Open1
Closed0

0 closed / 1 rated

2023

100.0%
Open0
Closed1

1 closed / 1 rated

All Permits

5 permits
StatusPermit #AddressIssued
OpenALT180009411 Bynner ST, Jamaica PlainApr 16, 2026<1yr
OpenSF1733956250 Washington ST, BostonJun 16, 2025<1yr
OpenSF1720133250 Washington ST, BostonMay 28, 2025
OpenSF158110352 Woodland RD, Jamaica PlainApr 12, 2024
ClosedSF141567839-43 Smith ST, Mission HillJan 10, 2023

See Other Applicants