Barry Kolsky
Barry Kolsky has filed 5 building permits in Boston since 2017, closing 20% of 5 rated permits. 4 permits remain open.
20%
5
Construction Permits
4
Currently Open
5
Rate-Eligible
permits > 1yr old
2017–2019
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Low Voltage4 rated
0.0% closed vs 28% median, 28.3 points lower
Building1 rated
100.0% closed vs 30% median, 69.8 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2019
100.0%
Open0
Closed1
1 closed / 1 rated
2018
0.0%
Open3
Closed0
0 closed / 3 rated
2017
0.0%
Open1
Closed0
0 closed / 1 rated
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Closed | ALT920815 | Long Form/Alteration Permit | 5 Monument SQ, Charlestown | Mar 8, 2019 | Sep 8, 2019 | $31,000 |
| Open | ELV819169 | Electrical Low Voltage | 3 Joy ST, Boston | Apr 30, 2018 | Oct 30, 2018 | $13,000 |
| Open | ELV819184 | Electrical Low Voltage | 5 Joy ST, Boston | Apr 13, 2018 | Oct 13, 2018 | $13,000 |
| Open | ELV819172 | Electrical Low Voltage | 4 Joy ST, Boston | Apr 13, 2018 | Oct 13, 2018 | $13,000 |
| Open | ELV723931 | Electrical Low Voltage | 340 Marlborough ST, Boston | Jun 26, 2017 | Dec 26, 2017 | $3,541 |