Dean Allaire

Dean Allaire has filed 5 building permits in Boston since 2019, closing 0% of 3 rated permits. 5 permits remain open. Primarily files building permits. 50.0 points below the city median of 50.0%. Busiest year: 2022 with 2 permits.

0%
-50.0 vs 50% median
5
Construction Permits
5
Currently Open
3
Rate-Eligible
permits > 1yr old
2019–2025
Years Active

Closure rate based on permits older than 1 year. "Issued" and "Stop Work" statuses are excluded.

Performance by Permit Type

Building3 rated

0.0% closed vs 31% median, 31.0 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2025

Open2
Closed0

Too early to rate — permits need 1 year to mature

2022

0.0%
Open2
Closed0

0 closed / 2 rated

2019

0.0%
Open1
Closed0

0 closed / 1 rated

All Permits

5 permits
StatusPermit #AddressIssued
OpenALT1786267180 Tremont ST, BostonDec 12, 2025<1yr
OpenALT1799086354-364 Longwood AV, BostonDec 12, 2025<1yr
OpenALT1404588131-153 Seaport BL, BostonDec 7, 2022
OpenSF131833751 Blossom ST, BostonApr 14, 2022
OpenALT91227710 Emerson PL, BostonFeb 4, 2019

See Other Applicants