DUANE CARREIRO

DUANE CARREIRO has filed 8 building permits in Boston since 2022, closing 17% of 6 rated permits. 7 permits remain open.

Also listed as: Duane Carreiro (41 permits)
17%
-32.7 vs 49% median
8
Construction Permits
7
Currently Open
6
Rate-Eligible
permits > 1yr old
2022–2026
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Building6 rated

16.7% closed vs 30% median, 13.5 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2026(YTD)

Open1
Closed0

Too early to rate — permits need 1 year to mature

2025

Open1
Closed0

Too early to rate — permits need 1 year to mature

2024

33.3%
Open2
Closed1

1 closed / 3 rated

2023

0.0%
Open2
Closed0

0 closed / 2 rated

2022

0.0%
Open1
Closed0

0 closed / 1 rated

All Permits

8 permits
StatusPermit #AddressIssued
OpenALT179716820 Shattuck ST, BostonJan 6, 2026<1yr
OpenALT169429360 Fenwood RD, BostonApr 10, 2025<1yr
ClosedSF164007875 Francis ST, BostonOct 3, 2024
OpenSF1546666800 Washington ST, BostonJan 25, 2024
OpenSF155079715 Francis ST, BostonJan 5, 2024
OpenSF1552383221 Longwood AV, BostonDec 18, 2023
OpenSF153854675 Francis ST, BostonNov 1, 2023
OpenSF127827075 Francis ST, BostonFeb 7, 2022

See Other Applicants