Rafael De Sousa

Rafael De Sousa has filed 18 building permits in Boston since 2025, closing 100% of 2 rated permits. 6 permits remain open. Primarily files electrical permits. 50.0 points above the city median of 50.0%. Busiest year: 2025 with 13 permits.

100%
+50.0 vs 50% median
17
Construction Permits
18 total
6
Currently Open
2
Rate-Eligible
permits > 1yr old
2025–2026
Years Active

Closure rate based on permits older than 1 year. "Issued" and "Stop Work" statuses are excluded.

Performance by Permit Type

Electrical1 rated

100.0% closed vs 60% median, 39.6 points higher

Building1 rated

100.0% closed vs 31% median, 69.0 points higher

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2026(YTD)

Open3
Closed1

Too early to rate — permits need 1 year to mature

2025

100.0%
Open3
Closed10

2 closed / 2 rated

All Permits

18 permits
StatusPermit #AddressIssued
OpenE184311014-16 Greenwood ST, DorchesterMay 8, 2026<1yr
OpenSF184309614-16 Greenwood ST, DorchesterMay 8, 2026<1yr
ClosedE182317326 Deering RD, MattapanApr 7, 2026<1yr
OpenSF182313326 Deering RD, MattapanApr 7, 2026<1yr
ClosedSF179893510 Rockland AV, RoxburyDec 2, 2025<1yr
ClosedE179893610 Rockland AV, RoxburyDec 2, 2025<1yr
ClosedSF178842224 Gay Head ST, Jamaica PlainOct 29, 2025<1yr
ClosedSF179382419 Saratoga ST, East BostonOct 29, 2025<1yr
ClosedE169323019 Saratoga ST, East BostonOct 29, 2025<1yr
ClosedE178837324 Gay Head ST, Jamaica PlainOct 29, 2025<1yr
ClosedE178214519 Saratoga ST, East BostonOct 3, 2025<1yr
OpenE1776420202 London ST, East BostonSep 29, 2025<1yr
ClosedE1770966202 London ST, East BostonSep 17, 2025<1yr
OpenSF176698165 Deering RD, MattapanSep 17, 2025<1yr
OpenE176682565 Deering RD, MattapanSep 17, 2025<1yr
ClosedSF1709265117 F ST, South BostonMay 16, 2025
ClosedSF166760119 Saratoga ST, East BostonJan 9, 2025
ClosedE166760619 Saratoga ST, East BostonJan 9, 2025

See Other Applicants