Wade Savard
Wade Savard has filed 3 building permits in Boston since 2020, closing 33% of 3 rated permits. 2 permits remain open.
33%
3
Construction Permits
2
Currently Open
3
Rate-Eligible
permits > 1yr old
2020–2024
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Electrical3 rated
33.3% closed vs 60% median, 26.7 points lower
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2024
0.0%
Open1
Closed0
0 closed / 1 rated
2020
50.0%
Open1
Closed1
1 closed / 2 rated
All Permits
3 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | E1588613 | Electrical Permit | 883 Huntington AV, Boston | Apr 10, 2024 | Oct 10, 2024 | $4,500 |
| Open | E1121133 | Electrical Permit | 1-7 Dalton ST, Boston | Sep 28, 2020 | Mar 28, 2021 | $2,500 |
| Closed | E1050683 | Electrical Permit | 1-7 Dalton ST, Boston | Feb 11, 2020 | Aug 11, 2020 | $17,950 |