1030 GIRARD ST NE, Washington, DC, 20017
12 open permits
13 permits have been filed at 1030 GIRARD ST NE since 2020. 12 remain open and 1 has been closed.
13
Total Permits
12
Open
1
Closed
Permit Type Breakdown
Building3 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.1 points lower
Plumbing1 rated
0.0% closed vs 40% median, 39.8 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
13 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Closed | ELECTRICAL | 1030 GIRARD ST NE, Washington | Jun 23, 2026<1yr | — | $36 | |
| Open | ELECTRICAL | 1030 GIRARD ST NE, Washington | Jun 23, 2026<1yr | — | $36 | |
| Open | ELECTRICAL | 1030 GIRARD ST NE, Washington | Jun 23, 2026<1yr | — | $43 | |
| Open | ELECTRICAL | 1030 GIRARD ST NE, Washington | Jun 22, 2026<1yr | — | $51 | |
| Open | ELECTRICAL | 1030 GIRARD ST NE, Washington | Jun 4, 2026<1yr | — | $22 | |
| Open | ELECTRICAL | 1030 GIRARD ST NE, Washington | Jun 3, 2026<1yr | — | $22 | |
| Open | ELECTRICAL | 1030 GIRARD ST NE, Washington | Mar 31, 2025 | — | $51 | |
| Open | SOLAR SYSTEM | 1030 GIRARD ST NE, Washington | Mar 24, 2025 | — | $275 | |
| Open | PLUMBING AND GAS | 1030 GIRARD ST NE, Washington | Oct 4, 2023 | — | $130 | |
| Open | ELECTRICAL | 1030 GIRARD ST NE, Washington | Oct 3, 2023 | — | $59 | |
| Open | ALTERATION AND REPAIR | 1030 GIRARD ST NE, Washington | Jul 28, 2023 | — | $397 | |
| Open | BUILDING | 1030 GIRARD ST NE, Washington | May 9, 2023 | — | $36 | |
| Open | ALTERATION AND REPAIR | 1030 GIRARD ST NE, Washington | May 15, 2020 | — | $502 |