1429 MORSE ST NE, Washington, DC, 20002
9 open permits
10 permits have been filed at 1429 MORSE ST NE since 2022. 9 remain open and 1 has been closed.
10
Total Permits
9
Open
1
Closed
Permit Type Breakdown
Plumbing5 rated
20.0% closed vs 40% median, 19.9 points lower
Building3 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical1 rated
0.0% closed vs 32% median, 32.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
10 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ALTERATION AND REPAIR | 1429 MORSE ST NE, Washington | Apr 13, 2023 | — | $145 | |
| Open | ELECTRICAL - HEAVY UP | 1429 MORSE ST NE, Washington | Aug 30, 2022 | — | $65 | |
| Open | ELECTRICAL - GENERAL | 1429 MORSE ST NE, Washington | Jul 21, 2022 | — | $22 | |
| Open | PLUMBING AND GAS | 1429 MORSE ST NE, Washington | Jul 21, 2022 | — | $117 | |
| Open | ALTERATION AND REPAIR | 1429 MORSE ST NE, Washington | Jul 14, 2022 | — | $853 | |
| Closed | PLUMBING | 1429 MORSE ST NE, Washington | Apr 22, 2022 | — | $29 | |
| Open | PLUMBING | 1429 MORSE ST NE, Washington | Apr 8, 2022 | — | $29 | |
| Open | PLUMBING | 1429 MORSE ST NE, Washington | Apr 1, 2022 | — | $29 | |
| Open | PLUMBING | 1429 MORSE ST NE, Washington | Apr 1, 2022 | — | $29 | |
| Open | BUILDING | 1429 MORSE ST NE, Washington | Feb 16, 2022 | — | $36 |