1455 CHURCH ST NW, Washington, DC, 20005
11 open permits
11 permits have been filed at 1455 CHURCH ST NW since 2024. 11 remain open and 0 have been closed.
11
Total Permits
11
Open
0
Closed
Permit Type Breakdown
Building3 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.1 points lower
Plumbing2 rated
0.0% closed vs 40% median, 39.8 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
11 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | SOLAR SYSTEM | 1455 CHURCH ST NW, Washington | May 4, 2026<1yr | — | $434 | |
| Open | ELECTRICAL | 1455 CHURCH ST NW, Washington | Feb 19, 2026<1yr | — | $1,473 | |
| Open | MECHANICAL | 1455 CHURCH ST NW, Washington | Feb 4, 2026<1yr | — | $3,577 | |
| Open | ELEVATOR - NEW | 1455 CHURCH ST NW, Washington | Dec 16, 2025<1yr | — | $187 | |
| Open | MISCELLANEOUS | 1455 CHURCH ST NW, Washington | Mar 19, 2025 | — | $36 | |
| Open | ELECTRICAL | 1455 CHURCH ST NW, Washington | Mar 7, 2025 | — | $5,618 | |
| Open | MISCELLANEOUS | 1455 CHURCH ST NW, Washington | Feb 5, 2025 | — | $36 | |
| Open | PLUMBING AND GAS | 1455 CHURCH ST NW, Washington | Jan 27, 2025 | — | $19,246 | |
| Open | ELECTRICAL | 1455 CHURCH ST NW, Washington | Jan 23, 2025 | — | $79 | |
| Open | PLUMBING AND GAS | 1455 CHURCH ST NW, Washington | Nov 26, 2024 | — | $2,235 | |
| Open | ADDITION ALTERATION REPAIR | 1455 CHURCH ST NW, Washington | Oct 17, 2024 | — | $55,194 |