1512 MONROE ST NE, Washington, DC, 20017
10 open permits
11 permits have been filed at 1512 MONROE ST NE since 2021. 10 remain open and 1 has been closed.
11
Total Permits
10
Open
1
Closed
Permit Type Breakdown
Building6 rated
16.7% closed vs 23% median, 5.9 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Plumbing1 rated
0.0% closed vs 40% median, 39.9 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
11 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 1512 MONROE ST NE, Washington | Jul 17, 2025<1yr | — | $22 | |
| Closed | ALTERATION AND REPAIR | 1512 MONROE ST NE, Washington | Jan 14, 2025 | — | $267 | |
| Open | ALTERATION AND REPAIR | 1512 MONROE ST NE, Washington | Oct 7, 2024 | — | $1,158 | |
| Open | BUILDING | 1512 MONROE ST NE, Washington | Sep 30, 2024 | — | $36 | |
| Open | ELECTRICAL | 1512 MONROE ST NE, Washington | Sep 18, 2023 | — | $43 | |
| Open | ELECTRICAL | 1512 MONROE ST NE, Washington | Jul 20, 2023 | — | $264 | |
| Open | MECHANICAL | 1512 MONROE ST NE, Washington | Jun 19, 2023 | — | $101 | |
| Open | PLUMBING AND GAS | 1512 MONROE ST NE, Washington | Apr 14, 2023 | — | $845 | |
| Open | ADDITION ALTERATION REPAIR | 1512 MONROE ST NE, Washington | Aug 5, 2022 | — | $5,458 | |
| Open | BUILDING | 1512 MONROE ST NE, Washington | Feb 18, 2022 | — | $36 | |
| Open | BUILDING | 1512 MONROE ST NE, Washington | Dec 21, 2021 | — | $36 |