1525 19TH ST SE, Washington, DC, 20020
9 open permits
9 permits have been filed at 1525 19TH ST SE since 2024. 9 remain open and 0 have been closed.
9
Total Permits
9
Open
0
Closed
Permit Type Breakdown
Building3 rated
0.0% closed vs 23% median, 22.6 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
9 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | PERMIT | 1525 19TH ST SE, Washington | Dec 4, 2025<1yr | — | $36 | |
| Open | PLUMBING AND GAS | 1525 19TH ST SE, Washington | Nov 21, 2025<1yr | — | $3 | |
| Open | ELECTRICAL | 1525 19TH ST SE, Washington | Nov 18, 2025<1yr | — | $3,193 | |
| Open | MECHANICAL | 1525 19TH ST SE, Washington | Nov 16, 2025<1yr | — | $810 | |
| Open | PLUMBING AND GAS | 1525 19TH ST SE, Washington | Nov 16, 2025<1yr | — | $2,587 | |
| Open | ADDITION ALTERATION REPAIR | 1525 19TH ST SE, Washington | Sep 9, 2025<1yr | — | $5,038 | |
| Open | ALTERATION AND REPAIR | 1525 19TH ST SE, Washington | Oct 24, 2024 | — | $2,376 | |
| Open | BUILDING | 1525 19TH ST SE, Washington | Aug 27, 2024 | — | $36 | |
| Open | BUILDING | 1525 19TH ST SE, Washington | Jun 26, 2024 | — | $36 |