2019 M ST NE, Washington, DC, 20002
9 open permits
9 permits have been filed at 2019 M ST NE since 2021. 9 remain open and 0 have been closed.
9
Total Permits
9
Open
0
Closed
Permit Type Breakdown
Electrical3 rated
0.0% closed vs 32% median, 32.2 points lower
Plumbing3 rated
0.0% closed vs 40% median, 39.9 points lower
Mechanical2 rated
0.0% closed vs 43% median, 43.2 points lower
Building1 rated
0.0% closed vs 23% median, 22.6 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
9 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | PLUMBING AND GAS | 2019 M ST NE, Washington | Mar 27, 2024 | — | $254 | |
| Open | ELECTRICAL | 2019 M ST NE, Washington | Aug 26, 2022 | — | $1,406 | |
| Open | ELECTRICAL | 2019 M ST NE, Washington | Aug 5, 2022 | — | $88 | |
| Open | PLUMBING AND GAS | 2019 M ST NE, Washington | Aug 5, 2022 | — | $254 | |
| Open | ELECTRICAL | 2019 M ST NE, Washington | Jun 27, 2022 | — | $65 | |
| Open | MECHANICAL | 2019 M ST NE, Washington | Jun 27, 2022 | — | $526 | |
| Open | MECHANICAL | 2019 M ST NE, Washington | Jun 27, 2022 | — | $455 | |
| Open | PLUMBING AND GAS | 2019 M ST NE, Washington | Jan 21, 2022 | — | $2,924 | |
| Open | ADDITION ALTERATION REPAIR | 2019 M ST NE, Washington | Feb 19, 2021 | — | $6,330 |