2021 F ST NW, Washington, DC, 20052
2 open permits
7 permits have been filed at 2021 F ST NW since 2020. 2 remain open and 5 have been closed.
7
Total Permits
2
Open
5
Closed
Permit Type Breakdown
Building3 rated
33.3% closed vs 23% median, 10.7 points higher
Electrical2 rated
100.0% closed vs 32% median, 67.8 points higher
Plumbing2 rated
100.0% closed vs 40% median, 60.1 points higher
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
7 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | MISCELLANEOUS | 2021 F ST NW, Washington | Jul 22, 2022 | — | $36 | |
| Open | MISCELLANEOUS | 2021 F ST NW, Washington | Jul 21, 2022 | — | $36 | |
| Closed | PLUMBING AND GAS | 2021 F ST NW, Washington | Jun 27, 2022 | — | $469 | |
| Closed | ELECTRICAL | 2021 F ST NW, Washington | Jun 9, 2022 | — | $594 | |
| Closed | PLUMBING AND GAS | 2021 F ST NW, Washington | Jun 9, 2022 | — | $26 | |
| Closed | ALTERATION AND REPAIR | 2021 F ST NW, Washington | Jun 1, 2022 | — | $5,891 | |
| Closed | ELECTRICAL | 2021 F ST NW, Washington | Jan 2, 2020 | — | $129 |