2023 3RD ST NE, Washington, DC, 20002
8 open permits
8 permits have been filed at 2023 3RD ST NE since 2020. 8 remain open and 0 have been closed.
8
Total Permits
8
Open
0
Closed
Permit Type Breakdown
Building2 rated
0.0% closed vs 23% median, 22.6 points lower
Plumbing2 rated
0.0% closed vs 40% median, 39.9 points lower
Electrical1 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 2023 3RD ST NE, Washington | Jul 10, 2025<1yr | — | $22 | |
| Open | SOLAR SYSTEM | 2023 3RD ST NE, Washington | Jul 2, 2025<1yr | — | $275 | |
| Open | MECHANICAL | 2023 3RD ST NE, Washington | Nov 1, 2022 | — | $92 | |
| Open | ELECTRICAL | 2023 3RD ST NE, Washington | Oct 27, 2022 | — | $578 | |
| Open | PLUMBING AND GAS | 2023 3RD ST NE, Washington | Jul 25, 2022 | — | $29 | |
| Open | PLUMBING AND GAS | 2023 3RD ST NE, Washington | Jul 18, 2022 | — | $532 | |
| Open | ADDITION ALTERATION REPAIR | 2023 3RD ST NE, Washington | Mar 29, 2022 | — | $4,809 | |
| Open | ALTERATION AND REPAIR | 2023 3RD ST NE, Washington | Dec 11, 2020 | — | $72 |