204 NEWCOMB ST SE, Washington, DC, 20032
8 open permits
8 permits have been filed at 204 NEWCOMB ST SE since 2021. 8 remain open and 0 have been closed.
8
Total Permits
8
Open
0
Closed
Permit Type Breakdown
Building2 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Plumbing1 rated
0.0% closed vs 40% median, 39.9 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 204 NEWCOMB ST SE, Washington | Jan 2, 2024 | — | $43 | |
| Open | SOLAR SYSTEM | 204 NEWCOMB ST SE, Washington | Oct 20, 2023 | — | $275 | |
| Open | MECHANICAL | 204 NEWCOMB ST SE, Washington | Sep 1, 2022 | — | $51 | |
| Open | PLUMBING AND GAS | 204 NEWCOMB ST SE, Washington | Aug 30, 2022 | — | $425 | |
| Open | ELECTRICAL | 204 NEWCOMB ST SE, Washington | Aug 26, 2022 | — | $444 | |
| Open | ALTERATION AND REPAIR | 204 NEWCOMB ST SE, Washington | Jul 19, 2022 | — | $2,259 | |
| Open | DEMOLITION | 204 NEWCOMB ST SE, Washington | Jun 1, 2022 | — | $150 | |
| Open | ALTERATION AND REPAIR | 204 NEWCOMB ST SE, Washington | Mar 1, 2021 | — | $4,719 |