219 62ND ST NE, Washington, DC, 20019
8 open permits
8 permits have been filed at 219 62ND ST NE since 2020. 8 remain open and 0 have been closed.
8
Total Permits
8
Open
0
Closed
Permit Type Breakdown
Electrical3 rated
0.0% closed vs 32% median, 32.2 points lower
Building2 rated
0.0% closed vs 23% median, 22.6 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Plumbing1 rated
0.0% closed vs 40% median, 39.9 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | SOLAR SYSTEM | 219 62ND ST NE, Washington | Sep 20, 2022 | — | $275 | |
| Open | ELECTRICAL | 219 62ND ST NE, Washington | Sep 20, 2022 | — | $72 | |
| Open | ELECTRICAL | 219 62ND ST NE, Washington | Jul 23, 2021 | — | $65 | |
| Open | ELECTRICAL | 219 62ND ST NE, Washington | Oct 25, 2020 | — | $317 | |
| Open | PLUMBING AND GAS | 219 62ND ST NE, Washington | Sep 24, 2020 | — | $385 | |
| Open | MECHANICAL | 219 62ND ST NE, Washington | Sep 24, 2020 | — | $51 | |
| Open | ALTERATION AND REPAIR | 219 62ND ST NE, Washington | Sep 24, 2020 | — | $150 | |
| Open | BUILDING | 219 62ND ST NE, Washington | Aug 19, 2020 | — | $36 |