22 MADISON ST NW, Washington, DC, 20011
9 open permits
10 permits have been filed at 22 MADISON ST NW since 2023. 9 remain open and 1 has been closed.
10
Total Permits
9
Open
1
Closed
Permit Type Breakdown
Building4 rated
0.0% closed vs 23% median, 22.6 points lower
Plumbing2 rated
50.0% closed vs 40% median, 10.1 points higher
Electrical1 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
10 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 22 MADISON ST NW, Washington | Sep 14, 2025<1yr | — | $79 | |
| Open | SOLAR SYSTEM | 22 MADISON ST NW, Washington | Sep 4, 2025<1yr | — | $275 | |
| Closed | PLUMBING | 22 MADISON ST NW, Washington | Nov 27, 2024 | — | $29 | |
| Open | ELECTRICAL | 22 MADISON ST NW, Washington | May 9, 2023 | — | $523 | |
| Open | MECHANICAL | 22 MADISON ST NW, Washington | Apr 19, 2023 | — | $51 | |
| Open | PLUMBING AND GAS | 22 MADISON ST NW, Washington | Apr 14, 2023 | — | $488 | |
| Open | ALTERATION AND REPAIR | 22 MADISON ST NW, Washington | Mar 15, 2023 | — | $1,673 | |
| Open | DECK | 22 MADISON ST NW, Washington | Mar 9, 2023 | — | $88 | |
| Open | FENCE | 22 MADISON ST NW, Washington | Mar 9, 2023 | — | $36 | |
| Open | BUILDING | 22 MADISON ST NW, Washington | Jan 31, 2023 | — | $36 |