225 E ST SE, Washington, DC, 20003
12 open permits
12 permits have been filed at 225 E ST SE since 2020. 12 remain open and 0 have been closed.
12
Total Permits
12
Open
0
Closed
Permit Type Breakdown
Building5 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical3 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Plumbing1 rated
0.0% closed vs 40% median, 39.9 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
12 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ALTERATION AND REPAIR | 225 E ST SE, Washington | Mar 20, 2026<1yr | — | $232 | |
| Open | ELECTRICAL | 225 E ST SE, Washington | Apr 14, 2022 | — | $123 | |
| Open | ADDITION ALTERATION REPAIR | 225 E ST SE, Washington | Apr 13, 2022 | — | $1,138 | |
| Open | ELECTRICAL | 225 E ST SE, Washington | Sep 17, 2020 | — | $506 | |
| Open | MECHANICAL | 225 E ST SE, Washington | Aug 14, 2020 | — | $101 | |
| Open | ALTERATION AND REPAIR | 225 E ST SE, Washington | May 19, 2020 | — | $158 | |
| Open | ALTERATION AND REPAIR | 225 E ST SE, Washington | May 13, 2020 | — | $66 | |
| Open | SOLAR SYSTEM | 225 E ST SE, Washington | May 12, 2020 | — | $275 | |
| Open | ELECTRICAL | 225 E ST SE, Washington | Apr 28, 2020 | — | $79 | |
| Open | PLUMBING AND GAS | 225 E ST SE, Washington | Feb 26, 2020 | — | $581 | |
| Open | ALTERATION AND REPAIR | 225 E ST SE, Washington | Feb 5, 2020 | — | $4,086 | |
| Open | ALTERATION AND REPAIR | 225 E ST SE, Washington | Jan 17, 2020 | — | $2,798 |