2321 HIGH ST SE, Washington, DC, 20020
11 open permits
11 permits have been filed at 2321 HIGH ST SE since 2020. 11 remain open and 0 have been closed.
11
Total Permits
11
Open
0
Closed
Permit Type Breakdown
Building3 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical3 rated
0.0% closed vs 32% median, 32.2 points lower
Plumbing2 rated
0.0% closed vs 40% median, 39.9 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
11 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ALTERATION AND REPAIR | 2321 HIGH ST SE, Washington | Nov 6, 2023 | — | $607 | |
| Open | ELECTRICAL | 2321 HIGH ST SE, Washington | Aug 9, 2023 | — | $65 | |
| Open | PLUMBING AND GAS | 2321 HIGH ST SE, Washington | Mar 22, 2023 | — | $299 | |
| Open | ELECTRICAL | 2321 HIGH ST SE, Washington | Mar 22, 2023 | — | $404 | |
| Open | MECHANICAL | 2321 HIGH ST SE, Washington | Mar 22, 2023 | — | $51 | |
| Open | PERMIT | 2321 HIGH ST SE, Washington | Apr 28, 2022 | — | $36 | |
| Open | ALTERATION AND REPAIR | 2321 HIGH ST SE, Washington | Aug 10, 2021 | — | $384 | |
| Open | PLUMBING AND GAS | 2321 HIGH ST SE, Washington | Jun 15, 2021 | — | $299 | |
| Open | ELECTRICAL | 2321 HIGH ST SE, Washington | Mar 27, 2021 | — | $404 | |
| Open | PERMIT | 2321 HIGH ST SE, Washington | Jan 26, 2021 | — | $36 | |
| Open | ADDITION ALTERATION REPAIR | 2321 HIGH ST SE, Washington | Jan 17, 2020 | — | $1,478 |