2322 19TH ST NW, Washington, DC, 20009
13 open permits
13 permits have been filed at 2322 19TH ST NW since 2020. 13 remain open and 0 have been closed.
13
Total Permits
13
Open
0
Closed
Permit Type Breakdown
Plumbing4 rated
0.0% closed vs 40% median, 39.9 points lower
Electrical3 rated
0.0% closed vs 32% median, 32.2 points lower
Building2 rated
0.0% closed vs 23% median, 22.6 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
13 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 2322 19TH ST NW, Washington | Nov 4, 2025<1yr | — | $57 | |
| Open | PLUMBING AND GAS | 2322 19TH ST NW, Washington | Apr 30, 2025 | — | $29 | |
| Open | NEW BUILDING | 2322 19TH ST NW, Washington | Aug 28, 2024 | — | $251 | |
| Open | ELECTRICAL | 2322 19TH ST NW, Washington | Apr 9, 2021 | — | $43 | |
| Open | PLUMBING AND GAS | 2322 19TH ST NW, Washington | Mar 15, 2021 | — | $123 | |
| Open | MECHANICAL | 2322 19TH ST NW, Washington | Feb 23, 2021 | — | $202 | |
| Open | PLUMBING AND GAS | 2322 19TH ST NW, Washington | Jan 6, 2021 | — | $17 | |
| Open | ELECTRICAL | 2322 19TH ST NW, Washington | Nov 11, 2020 | — | $36 | |
| Open | SOLAR SYSTEM | 2322 19TH ST NW, Washington | Oct 26, 2020 | — | $275 | |
| Open | ELECTRICAL | 2322 19TH ST NW, Washington | Sep 17, 2020 | — | $282 | |
| Open | PLUMBING AND GAS | 2322 19TH ST NW, Washington | Sep 12, 2020 | — | $196 | |
| Open | NEW BUILDING | 2322 19TH ST NW, Washington | Jan 23, 2020 | — | $314 | |
| Open | RAZE | 2322 19TH ST NW, Washington | Jan 21, 2020 | — | $85 |