413 60TH ST NE, Washington, DC, 20019
11 open permits
12 permits have been filed at 413 60TH ST NE since 2020. 11 remain open and 1 has been closed.
12
Total Permits
11
Open
1
Closed
Permit Type Breakdown
Plumbing5 rated
20.0% closed vs 40% median, 19.9 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Building1 rated
0.0% closed vs 23% median, 22.6 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
12 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 413 60TH ST NE, Washington | Sep 9, 2025<1yr | — | $1,799 | |
| Open | ELECTRICAL | 413 60TH ST NE, Washington | May 13, 2025 | — | $110 | |
| Open | PLUMBING AND GAS | 413 60TH ST NE, Washington | Apr 28, 2025 | — | $205 | |
| Open | PLUMBING AND GAS | 413 60TH ST NE, Washington | Mar 11, 2025 | — | $57 | |
| Open | PERMIT | 413 60TH ST NE, Washington | Feb 19, 2025 | — | $36 | |
| Open | PLUMBING AND GAS | 413 60TH ST NE, Washington | Jun 10, 2024 | — | $563 | |
| Open | ELECTRICAL | 413 60TH ST NE, Washington | Apr 30, 2024 | — | $1,051 | |
| Open | MECHANICAL | 413 60TH ST NE, Washington | Apr 30, 2024 | — | $405 | |
| Open | PLUMBING AND GAS | 413 60TH ST NE, Washington | Apr 30, 2024 | — | $1,428 | |
| Open | NEW BUILDING | 413 60TH ST NE, Washington | Feb 13, 2024 | — | $2,007 | |
| Open | RAZE | 413 60TH ST NE, Washington | Mar 13, 2020 | — | $101 | |
| Closed | PLUMBING AND GAS | 413 60TH ST NE, Washington | Feb 25, 2020 | — | $57 |