42 47TH ST SE, Washington, DC, 20019
8 open permits
8 permits have been filed at 42 47TH ST SE since 2021. 8 remain open and 0 have been closed.
8
Total Permits
8
Open
0
Closed
Permit Type Breakdown
Plumbing3 rated
0.0% closed vs 40% median, 39.9 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Building1 rated
0.0% closed vs 23% median, 22.6 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 42 47TH ST SE, Washington | Nov 15, 2024 | — | $36 | |
| Open | SOLAR SYSTEM | 42 47TH ST SE, Washington | Nov 15, 2024 | — | $275 | |
| Open | PLUMBING AND GAS | 42 47TH ST SE, Washington | Aug 3, 2022 | — | $66 | |
| Open | PLUMBING AND GAS | 42 47TH ST SE, Washington | Jun 27, 2022 | — | $57 | |
| Open | MECHANICAL | 42 47TH ST SE, Washington | May 31, 2022 | — | $51 | |
| Open | PLUMBING AND GAS | 42 47TH ST SE, Washington | Mar 24, 2022 | — | $387 | |
| Open | ELECTRICAL | 42 47TH ST SE, Washington | Mar 24, 2022 | — | $417 | |
| Open | NEW BUILDING | 42 47TH ST SE, Washington | Oct 8, 2021 | — | $648 |