439 Q ST NW, Washington, DC, 20001
10 open permits
10 permits have been filed at 439 Q ST NW since 2021. 10 remain open and 0 have been closed.
10
Total Permits
10
Open
0
Closed
Permit Type Breakdown
Plumbing3 rated
0.0% closed vs 40% median, 39.9 points lower
Building2 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical2 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
10 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | PLUMBING AND GAS | 439 Q ST NW, Washington | Oct 15, 2023 | — | $279 | |
| Open | PERMIT | 439 Q ST NW, Washington | Sep 13, 2023 | — | $36 | |
| Open | ELECTRICAL | 439 Q ST NW, Washington | Aug 28, 2023 | — | $717 | |
| Open | MECHANICAL | 439 Q ST NW, Washington | Aug 28, 2023 | — | $101 | |
| Open | PLUMBING AND GAS | 439 Q ST NW, Washington | Aug 28, 2023 | — | $715 | |
| Open | PLUMBING AND GAS | 439 Q ST NW, Washington | Jun 6, 2022 | — | $715 | |
| Open | ELECTRICAL | 439 Q ST NW, Washington | Jun 3, 2022 | — | $638 | |
| Open | MECHANICAL | 439 Q ST NW, Washington | Jun 3, 2022 | — | $101 | |
| Open | ADDITION ALTERATION REPAIR | 439 Q ST NW, Washington | Dec 9, 2021 | — | $1,442 | |
| Open | BUILDING | 439 Q ST NW, Washington | Apr 20, 2021 | — | $36 |