520 51ST ST SE, Washington, DC, 20019
8 open permits
8 permits have been filed at 520 51ST ST SE since 2023. 8 remain open and 0 have been closed.
8
Total Permits
8
Open
0
Closed
Permit Type Breakdown
Building1 rated
0.0% closed vs 23% median, 22.6 points lower
Plumbing1 rated
0.0% closed vs 40% median, 39.9 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ALTERATION AND REPAIR | 520 51ST ST SE, Washington | Jan 26, 2026<1yr | — | $36 | |
| Open | PLUMBING AND GAS | 520 51ST ST SE, Washington | Sep 10, 2025<1yr | — | $79 | |
| Open | ELECTRICAL | 520 51ST ST SE, Washington | Jul 27, 2025<1yr | — | $540 | |
| Open | MECHANICAL | 520 51ST ST SE, Washington | Jun 16, 2025<1yr | — | $51 | |
| Open | PLUMBING AND GAS | 520 51ST ST SE, Washington | Apr 9, 2025 | — | $453 | |
| Open | PERMIT | 520 51ST ST SE, Washington | Nov 22, 2024 | — | $36 | |
| Open | PERMIT | 520 51ST ST SE, Washington | Apr 2, 2024 | — | $36 | |
| Open | NEW BUILDING | 520 51ST ST SE, Washington | May 25, 2023 | — | $1,738 |