5429 CATHEDRAL AVE NW, Washington, DC, 20016
12 open permits
12 permits have been filed at 5429 CATHEDRAL AVE NW since 2020. 12 remain open and 0 have been closed.
12
Total Permits
12
Open
0
Closed
Permit Type Breakdown
Building5 rated
0.0% closed vs 23% median, 22.6 points lower
Plumbing4 rated
0.0% closed vs 40% median, 39.9 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
12 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | SWIMMING POOL | 5429 CATHEDRAL AVE NW, Washington | Dec 27, 2021 | — | $286 | |
| Open | ELECTRICAL | 5429 CATHEDRAL AVE NW, Washington | May 11, 2021 | — | $892 | |
| Open | PLUMBING AND GAS | 5429 CATHEDRAL AVE NW, Washington | May 5, 2021 | — | $261 | |
| Open | MECHANICAL | 5429 CATHEDRAL AVE NW, Washington | Apr 13, 2021 | — | $202 | |
| Open | PLUMBING AND GAS | 5429 CATHEDRAL AVE NW, Washington | Apr 1, 2021 | — | $57 | |
| Open | PLUMBING AND GAS | 5429 CATHEDRAL AVE NW, Washington | Mar 26, 2021 | — | $1,023 | |
| Open | ADDITION ALTERATION REPAIR | 5429 CATHEDRAL AVE NW, Washington | Mar 4, 2021 | — | $158 | |
| Open | ALTERATION AND REPAIR | 5429 CATHEDRAL AVE NW, Washington | Oct 26, 2020 | — | $1,835 | |
| Open | ELECTRICAL | 5429 CATHEDRAL AVE NW, Washington | Oct 15, 2020 | — | $65 | |
| Open | NEW BUILDING | 5429 CATHEDRAL AVE NW, Washington | Sep 3, 2020 | — | $3,370 | |
| Open | PLUMBING AND GAS | 5429 CATHEDRAL AVE NW, Washington | May 27, 2020 | — | $57 | |
| Open | MISCELLANEOUS | 5429 CATHEDRAL AVE NW, Washington | Jan 21, 2020 | — | $36 |