551 LEBAUM ST SE, Washington, DC, 20032
8 open permits
8 permits have been filed at 551 LEBAUM ST SE since 2024. 8 remain open and 0 have been closed.
8
Total Permits
8
Open
0
Closed
Permit Type Breakdown
Building2 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | BUILDING | 551 LEBAUM ST SE, Washington | Oct 10, 2025<1yr | — | $36 | |
| Open | ELECTRICAL | 551 LEBAUM ST SE, Washington | Jul 23, 2025<1yr | — | $94 | |
| Open | SOLAR SYSTEM | 551 LEBAUM ST SE, Washington | Jul 23, 2025<1yr | — | $751 | |
| Open | ELECTRICAL | 551 LEBAUM ST SE, Washington | Apr 28, 2025 | — | $94 | |
| Open | SOLAR SYSTEM | 551 LEBAUM ST SE, Washington | Apr 28, 2025 | — | $758 | |
| Open | ELECTRICAL | 551 LEBAUM ST SE, Washington | Jul 15, 2024 | — | $75 | |
| Open | ALTERATION AND REPAIR | 551 LEBAUM ST SE, Washington | Jul 10, 2024 | — | $5,980 | |
| Open | BUILDING | 551 LEBAUM ST SE, Washington | Feb 21, 2024 | — | $36 |