635 A ST NE, Washington, DC, 20002
6 open permits
7 permits have been filed at 635 A ST NE since 2022. 6 remain open and 1 has been closed.
7
Total Permits
6
Open
1
Closed
All Permits
7 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | B2510211 | ALTERATION AND REPAIR | 635 A ST NE, Washington | Sep 24, 2025<1yr | — | $205 |
| Open | B2407524 | ALTERATION AND REPAIR | 635 A ST NE, Washington | Jun 21, 2024 | — | $525 |
| Open | P2405933 | PLUMBING AND GAS | 635 A ST NE, Washington | Apr 22, 2024 | — | $139 |
| Open | P2405634 | PLUMBING AND GAS | 635 A ST NE, Washington | Apr 22, 2024 | — | $277 |
| Open | E2405781 | ELECTRICAL | 635 A ST NE, Washington | Mar 14, 2024 | — | $158 |
| Open | B2401560 | ALTERATION AND REPAIR | 635 A ST NE, Washington | Dec 18, 2023 | — | $1,870 |
| Closed | B2201710 | ALTERATION AND REPAIR | 635 A ST NE, Washington | Mar 31, 2022 | — | $188 |