705 TAYLOR ST NW, Washington, DC, 20011
5 open permits
9 permits have been filed at 705 TAYLOR ST NW since 2021. 5 remain open and 4 have been closed.
9
Total Permits
5
Open
4
Closed
Permit Type Breakdown
Plumbing3 rated
33.3% closed vs 40% median, 6.6 points lower
Building2 rated
100.0% closed vs 23% median, 77.4 points higher
Electrical1 rated
100.0% closed vs 32% median, 67.8 points higher
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
9 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Closed | ALTERATION AND REPAIR | 705 TAYLOR ST NW, Washington | Sep 28, 2023 | — | $80 | |
| Closed | ELECTRICAL | 705 TAYLOR ST NW, Washington | Jun 8, 2023 | — | $644 | |
| Open | PLUMBING AND GAS | 705 TAYLOR ST NW, Washington | Jun 2, 2023 | — | $132 | |
| Open | PLUMBING AND GAS | 705 TAYLOR ST NW, Washington | Mar 21, 2023 | — | $112 | |
| Open | PERMIT | 705 TAYLOR ST NW, Washington | Sep 27, 2022 | — | $36 | |
| Open | MECHANICAL | 705 TAYLOR ST NW, Washington | Feb 15, 2022 | — | $101 | |
| Closed | PLUMBING AND GAS | 705 TAYLOR ST NW, Washington | Feb 15, 2022 | — | $790 | |
| Open | PERMIT | 705 TAYLOR ST NW, Washington | Jan 11, 2022 | — | $36 | |
| Closed | ADDITION ALTERATION REPAIR | 705 TAYLOR ST NW, Washington | Mar 3, 2021 | — | $6,988 |