725 19TH ST NE, Washington, DC, 20002
11 open permits
11 permits have been filed at 725 19TH ST NE since 2021. 11 remain open and 0 have been closed.
11
Total Permits
11
Open
0
Closed
Permit Type Breakdown
Building2 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical2 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical2 rated
0.0% closed vs 43% median, 43.2 points lower
Plumbing2 rated
0.0% closed vs 40% median, 39.9 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
11 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | SOLAR SYSTEM | 725 19TH ST NE, Washington | Nov 20, 2024 | — | $839 | |
| Open | ELECTRICAL | 725 19TH ST NE, Washington | Jun 28, 2024 | — | $86 | |
| Open | SOLAR SYSTEM | 725 19TH ST NE, Washington | Jun 14, 2024 | — | $847 | |
| Open | MECHANICAL | 725 19TH ST NE, Washington | Jun 22, 2023 | — | $359 | |
| Open | ELEVATOR - NEW | 725 19TH ST NE, Washington | May 1, 2023 | — | $94 | |
| Open | PLUMBING AND GAS | 725 19TH ST NE, Washington | Mar 20, 2023 | — | $18 | |
| Open | ELECTRICAL | 725 19TH ST NE, Washington | Jan 6, 2023 | — | $220 | |
| Open | MECHANICAL | 725 19TH ST NE, Washington | Dec 15, 2022 | — | $51 | |
| Open | PLUMBING AND GAS | 725 19TH ST NE, Washington | Dec 13, 2022 | — | $29 | |
| Open | ADDITION ALTERATION REPAIR | 725 19TH ST NE, Washington | Sep 20, 2022 | — | $1,805 | |
| Open | MISCELLANEOUS | 725 19TH ST NE, Washington | Dec 20, 2021 | — | $36 |