725 SHEPHERD ST NW, Washington, DC, 20011
6 open permits
8 permits have been filed at 725 SHEPHERD ST NW since 2023. 6 remain open and 2 have been closed.
8
Total Permits
6
Open
2
Closed
Permit Type Breakdown
Electrical3 rated
33.3% closed vs 32% median, 1.1 points higher
Building1 rated
0.0% closed vs 23% median, 22.6 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | PLUMBING AND GAS | 725 SHEPHERD ST NW, Washington | May 21, 2026<1yr | — | $29 | |
| Open | EXPEDITED | 725 SHEPHERD ST NW, Washington | Jul 17, 2025<1yr | — | $73 | |
| Open | EXPEDITED | 725 SHEPHERD ST NW, Washington | May 10, 2025 | — | $73 | |
| Open | ELECTRICAL | 725 SHEPHERD ST NW, Washington | Apr 7, 2024 | — | $65 | |
| Closed | ELECTRICAL | 725 SHEPHERD ST NW, Washington | Nov 30, 2023 | — | $94 | |
| Closed | SOLAR SYSTEM | 725 SHEPHERD ST NW, Washington | Nov 21, 2023 | — | $275 | |
| Open | BUILDING | 725 SHEPHERD ST NW, Washington | Aug 31, 2023 | — | $36 | |
| Open | ELECTRICAL - GENERAL | 725 SHEPHERD ST NW, Washington | Aug 31, 2023 | — | $22 |