75 49TH ST NE, Washington, DC, 20019
7 open permits
7 permits have been filed at 75 49TH ST NE since 2021. 7 remain open and 0 have been closed.
7
Total Permits
7
Open
0
Closed
Permit Type Breakdown
Plumbing3 rated
0.0% closed vs 40% median, 39.9 points lower
Building1 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical1 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
7 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | BUILDING | 75 49TH ST NE, Washington | Apr 30, 2026<1yr | — | $275 | |
| Open | PLUMBING AND GAS | 75 49TH ST NE, Washington | Jul 5, 2022 | — | $57 | |
| Open | MECHANICAL | 75 49TH ST NE, Washington | May 31, 2022 | — | $51 | |
| Open | PLUMBING AND GAS | 75 49TH ST NE, Washington | Mar 17, 2022 | — | $387 | |
| Open | PLUMBING AND GAS | 75 49TH ST NE, Washington | Mar 2, 2022 | — | $62 | |
| Open | ELECTRICAL | 75 49TH ST NE, Washington | Feb 10, 2022 | — | $417 | |
| Open | NEW BUILDING | 75 49TH ST NE, Washington | Oct 7, 2021 | — | $1,302 |