757 GALLATIN ST NE, Washington, DC, 20017
8 open permits
9 permits have been filed at 757 GALLATIN ST NE since 2021. 8 remain open and 1 has been closed.
9
Total Permits
8
Open
1
Closed
Permit Type Breakdown
Building1 rated
0.0% closed vs 23% median, 22.6 points lower
Electrical1 rated
0.0% closed vs 32% median, 32.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
9 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 757 GALLATIN ST NE, Washington | Jun 4, 2026<1yr | — | $119 | |
| Open | MECHANICAL | 757 GALLATIN ST NE, Washington | Jun 4, 2026<1yr | — | $51 | |
| Open | ALTERATION AND REPAIR | 757 GALLATIN ST NE, Washington | Jun 4, 2026<1yr | — | $308 | |
| Open | PLUMBING AND GAS | 757 GALLATIN ST NE, Washington | Jun 4, 2026<1yr | — | $145 | |
| Closed | DECK | 757 GALLATIN ST NE, Washington | Mar 30, 2026<1yr | — | $176 | |
| Open | BUILDING | 757 GALLATIN ST NE, Washington | Feb 5, 2026<1yr | — | $36 | |
| Open | ALTERATION AND REPAIR | 757 GALLATIN ST NE, Washington | Feb 2, 2023 | — | $267 | |
| Open | ELECTRICAL | 757 GALLATIN ST NE, Washington | Apr 19, 2021 | — | $79 | |
| Open | SOLAR SYSTEM | 757 GALLATIN ST NE, Washington | Apr 14, 2021 | — | $275 |