78 54TH ST SE, Washington, DC, 20019
6 open permits
7 permits have been filed at 78 54TH ST SE since 2020. 6 remain open and 1 has been closed.
7
Total Permits
6
Open
1
Closed
Permit Type Breakdown
Building2 rated
50.0% closed vs 23% median, 27.4 points higher
Electrical1 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Plumbing1 rated
0.0% closed vs 40% median, 39.9 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
7 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | BUILDING | 78 54TH ST SE, Washington | May 15, 2023 | — | $36 | |
| Closed | ALTERATION AND REPAIR | 78 54TH ST SE, Washington | Feb 24, 2022 | — | $111 | |
| Open | PLUMBING AND GAS | 78 54TH ST SE, Washington | Jul 6, 2021 | — | $29 | |
| Open | MECHANICAL | 78 54TH ST SE, Washington | Jul 6, 2021 | — | $51 | |
| Open | ELECTRICAL | 78 54TH ST SE, Washington | Apr 25, 2021 | — | $79 | |
| Open | SOLAR SYSTEM | 78 54TH ST SE, Washington | Apr 22, 2021 | — | $275 | |
| Open | EXPEDITED | 78 54TH ST SE, Washington | Apr 30, 2020 | — | $73 |