806 E ST SE, Washington, DC, 20003
2 open permits
5 permits have been filed at 806 E ST SE since 2022. 2 remain open and 3 have been closed.
5
Total Permits
2
Open
3
Closed
Permit Type Breakdown
Plumbing2 rated
50.0% closed vs 40% median, 10.1 points higher
Building1 rated
100.0% closed vs 23% median, 77.4 points higher
Electrical1 rated
100.0% closed vs 32% median, 67.8 points higher
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ALTERATION AND REPAIR | 806 E ST SE, Washington | Feb 11, 2026<1yr | — | $793 | |
| Open | PLUMBING AND GAS | 806 E ST SE, Washington | Jun 29, 2023 | — | $29 | |
| Closed | ELECTRICAL | 806 E ST SE, Washington | Feb 10, 2022 | — | $75 | |
| Closed | PLUMBING AND GAS | 806 E ST SE, Washington | Jan 31, 2022 | — | $249 | |
| Closed | ALTERATION AND REPAIR | 806 E ST SE, Washington | Jan 21, 2022 | — | $970 |