7629 Flower Meadow Dr, San Diego, CA, 92126
3 open permits
5 permits have been filed at 7629 Flower Meadow Dr since 2021, involving 4 applicants. 3 remain open and 2 have been closed.
5
Total Permits
3
Open
2
Closed
4
Applicants
Applicants at This Address
| Applicant | Permits | Open |
|---|---|---|
| Baker Electric Home Energy | 2 | 1 |
| NEED FOR BUILD INC | 1 | 1 |
| Jim Burr | 1 | 0 |
| ASI HASTINGS | 1 | 1 |
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | ||||
|---|---|---|---|---|---|---|---|
| Closed | PMT-3161546 | Approval - Construction - Electrical Pmt - PV Combo | 7629 Flower Meadow Dr, San Diego | Baker Electric Home Energy | Jul 13, 2022 | Apr 24, 2023 | — |
| Open | PMT-3161084 | No-Plan - Residential - Combination Mech/Elec/Plum | 7629 Flower Meadow Dr, San Diego | Baker Electric Home Energy | Jun 21, 2022 | — | — |
| Open | PMT-3147254 | Combination Building Permit | 7629 Flower Meadow Dr, San Diego | NEED FOR BUILD INC | Apr 20, 2022 | — | $3,500 |
| Open | PMT-3122658 | No-Plan - Residential - Combination Mech/Elec/Plum | 7629 Flower Meadow Dr, San Diego | ASI HASTINGS | Oct 28, 2021 | — | — |
| Closed | PMT-3105306 | No-Plan - Nonresidential/Multifamily - Plumbing | 7629 Flower Meadow Dr, San Diego | Jim Burr | Jun 25, 2021 | Jan 3, 2022 | — |