Everlast Construction
Everlast Construction has filed 2 building permits in San Diego since , closing 0% of 2 rated permits. 2 permits remain open. Primarily files building permits. 82.8 points below the city median of 82.8%. Busiest year: with 2 permits.
0%
2
Construction Permits
2
Currently Open
2
Rate-Eligible
permits > 1yr old
null–null
Years Active
Closure rate based on permits older than 1 year. "Issued" and "Stop Work" statuses are excluded.
Performance by Permit Type
Building1 rated
0.0% closed vs 97% median, 97.1 points lower
Electrical1 rated
0.0% closed vs 75% median, 75.0 points lower
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
0.0%
Open2
Closed0
0 closed / 2 rated
All Permits
2 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | No-Plan - Nonresidential/Multifamily - Electrical | — | — | — | ||
| Open | Combination Building Permit | — | — | $85,982.73 |
See Other Applicants
Everlast, EverlastEVERLAST H.E.S., EVERLAST ......Everlast H.E.S, H.E.S EverlastEVERLAST HES, KYLE NICOLTTIEverlast Home Energy, Joshua TeetsEverlast Home Energy Solution , Jim RichardsonEverlast Home Energy Solution, Ken CleggEverlast Home Energy SolutionsEverlast Home Energy Solutions, Everlast Home E Everlast Home EnergyEVERLAST HOME ENERGY SOLUTIONS, JOSHUA TEETS