Jeffrey Kresch
Jeffrey Kresch has filed 8 building permits in San Diego since 2021, closing 13% of 8 rated permits. 7 permits remain open.
13%
8
Construction Permits
7
Currently Open
8
Rate-Eligible
permits > 1yr old
2021–2024
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Building4 rated
0.0% closed vs 57% median, 56.6 points lower
Electrical2 rated
0.0% closed vs 71% median, 70.8 points lower
Plumbing2 rated
50.0% closed vs 50% median, 0.3 points lower
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2024
0.0%
Open1
Closed0
0 closed / 1 rated
2023
20.0%
Open4
Closed1
1 closed / 5 rated
2021
0.0%
Open1
Closed0
0 closed / 1 rated
0.0%
Open1
Closed0
0 closed / 1 rated
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | PMT-3222676 | Building Permit | 4135 Campus Point Ct, San Diego | Apr 26, 2024 | Aug 11, 2026 | $125,085,521.1 |
| Closed | PMT-3189057 | Plumbing Pmt | 10292 Campus Point Dr, San Diego | May 22, 2023 | Dec 9, 2025 | — |
| Open | PMT-3201895 | Plumbing Pmt | 10292 Campus Point Dr, San Diego | May 22, 2023 | Dec 9, 2025 | — |
| Open | PMT-3189056 | Electrical Pmt | 10292 Campus Point Dr, San Diego | May 22, 2023 | Dec 9, 2025 | — |
| Open | PMT-3189054 | Building Permit | 10292 Campus Point Dr, San Diego | May 22, 2023 | Dec 9, 2025 | $103,054,587.16 |
| Open | PMT-3201890 | Building Permit | 10292 Campus Point Dr, San Diego | May 22, 2023 | Dec 9, 2025 | $1,553,722.56 |
| Open | PMT-3117582 | Building Permit | 9880 Campus Point Dr, San Diego | Dec 8, 2021 | Aug 29, 2022 | $582,450 |
| Open | PMT-3201894 | Electrical Pmt | 10292 Campus Point Dr, San Diego | — | Dec 9, 2025 | — |