Namenyi Electric
Namenyi Electric has filed 6 building permits in San Diego since 2020, closing 83% of 6 rated permits. 1 permit remains open.
83%
6
Construction Permits
1
Currently Open
6
Rate-Eligible
permits > 1yr old
2020–2024
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Electrical4 rated
100.0% closed vs 71% median, 29.2 points higher
Building2 rated
50.0% closed vs 57% median, 6.5 points lower
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2024
100.0%
Open0
Closed1
1 closed / 1 rated
2023
100.0%
Open0
Closed2
2 closed / 2 rated
2021
100.0%
Open0
Closed1
1 closed / 1 rated
2020
50.0%
Open1
Closed1
1 closed / 2 rated
All Permits
6 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Closed | PMT-3286889 | No-Plan - Nonresidential/Multifamily - Electrical | 809 Ostend Ct, San Diego | Apr 23, 2024 | Nov 3, 2024 | — |
| Closed | PMT-3240968 | Photovoltaic - SB 379 | 1653 Alta La Jolla Dr, San Diego | Aug 14, 2023 | Apr 16, 2024 | — |
| Closed | PMT-3228038 | Approval - Construction - Electrical Pmt - PV Combo | 1639 Alta La Jolla Dr, San Diego | Jun 13, 2023 | Jun 12, 2025 | — |
| Closed | PMT-3127850 | No-Plan - Residential - Combination Mech/Elec/Plum | 2042 Avila Ct, San Diego | Dec 3, 2021 | — | — |
| Closed | PMT-3080673 | Approval - Construction - Electrical Pmt - PV Combo | 6863 Waite Dr, San Diego | Oct 19, 2020 | May 17, 2021 | — |
| Open | PMT-3072027 | No-Plan - Residential - Combination Mech/Elec/Plum | 9594 High Park Ln, San Diego | Jul 6, 2020 | Jul 17, 2021 | — |