Prevost/Skyline Construction

Prevost/Skyline Construction has filed 7 building permits in San Diego since 2023, closing 57% of 7 rated permits. 3 permits remain open.

57%
-9.6 vs 67% median
7
Construction Permits
3
Currently Open
7
Rate-Eligible
permits > 1yr old
2023–2024
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Building2 rated

50.0% closed vs 57% median, 6.6 points lower

Electrical2 rated

50.0% closed vs 71% median, 20.8 points lower

Mechanical1 rated

100.0% closed vs 42% median, 57.8 points higher

Plumbing1 rated

100.0% closed vs 50% median, 49.7 points higher

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2024

100.0%
Open0
Closed4

4 closed / 4 rated

2023

0.0%
Open3
Closed0

0 closed / 3 rated

All Permits

7 permits
StatusPermit #AddressIssued
ClosedPMT-32815224921 Directors Pl, Suite 200May 6, 2024
ClosedPMT-32815214921 Directors Pl, Suite 200May 6, 2024
ClosedPMT-32815234921 Directors Pl, Suite 200May 6, 2024
ClosedPMT-32815184921 Directors Pl, Suite 200May 6, 2024
OpenPMT-31840186450 Sequence Dr, San DiegoApr 24, 2023
OpenPMT-31691016450 Sequence Dr, San DiegoApr 24, 2023
OpenPMT-31691006450 Sequence Dr, San DiegoApr 24, 2023

See Other Applicants