Stellar Solar, David Grims
Stellar Solar, David Grims has filed 24 building permits in San Diego since , closing 100% of 1 rated permits. All permits are closed. Primarily files building permits. 24.9 points above the city median of 75.1%.
100%
1
Construction Permits
24 total
0
Currently Open
1
Rate-Eligible
permits > 1yr old
null–null
Years Active
Closure rate based on permits older than 1 year. "Issued" and "Stop Work" statuses are excluded.
Performance by Permit Type
Building1 rated
100.0% closed vs 95% median, 5.0 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
100.0%
Open0
Closed1
1 closed / 1 rated
All Permits
24 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Closed | Electrical-Photovoltaic | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical-Photovoltaic | — | — | — | ||
| Closed | Electrical-Photovoltaic | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical-Photovoltaic | — | — | — | ||
| Closed | Electrical-Photovoltaic | — | — | — | ||
| Closed | Electrical-Photovoltaic | — | — | — | ||
| Closed | Electrical-Photovoltaic | — | — | — | ||
| Closed | Building Permit | — | — | $50,000 | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Closed | Electrical Permit | — | — | — | ||
| Open | Construction Change - Building | — | — | — |